Showing posts with label Financing. Show all posts
Showing posts with label Financing. Show all posts

Friday, December 3, 2021

Into December

 Platform Completion

A headache of a task with much more to be done. Moving on to the next phase of this project. Need to order at least 400 3" blocks, 20 sacks of cement and about 20 steel. Aiming to have this construction done before Xmas break is over.

 

Rental Backwall

Proposed area for backwall at the lower levels. Currently,  water flow channels directly onto the building.

 Gravel needed for backwall construction.




Wednesday, April 28, 2021

Rental 2 Bottom

 Additional Kitchen and Bathroom Areas

Progress so far.....




Tuesday, February 4, 2020

Reshuffled and Baby Step #1 Revisited

Have taken the step to assist in helping out a single parent father with his son.
_______________________________________

Baby Step One completed again. Happy about that... Hooray to me....

Sunday, July 21, 2019

Saturday, October 20, 2018

Rental


Last Saturday, 13th, unexpectedly had to rent out an unfinished apartment unit to a student. Life.